site map | dealer login | request
c120

The Hydroflow C Range for the whole range of pipe sizes.
Custom units are made to fit the larger pipe size.

The versatile Hydroflow C Range covers all areas of commerce and industry that suffer from limescale.
We recommend that in finding the correct Hydropath solution, you seek expert consultation prior to installation.

Proven technology with performance.
Fully encapsulated for total reliability and water resistance.
Remote monitoring facility available.
Effective on all types of pipework.

psu
Installation
The compact transducer unit fits all types & sizes of pipework (30mm to 200mm O/D).
Designed for easy installation, the unit simply straps around the pipe and is connected through the power supply unit (PSU) to the mains electric supply with the cables/connectors supplied.
copper
reta
Case studies - Hydropath in Action    about limescale    email Hydropath 
Click any model for a larger image
c160 c120 c100 c60 c45
HydroFLOW C160
Max Pipe outside diameter 200mm
HydroFLOW C120
Max Pipe outside diameter 130mm
HydroFLOW C100
Max Pipe outside diameter 108mm
HydroFLOW C60
Max Pipe outside diameter 60mm
HydroFLOW C45
Max Pipe outside diameter 45mm
HydroFLOW C Range in action - if you wish to view a Case Study please click

Want more information?
To download our current brochure (PDF format) go to our Download Centre

If you would like more information on how it works see our Technology page.

Please note this website is only a guide. To find the optimum solution to gain the best results for your specific application, please contact your area's Hydropath representative.
See Contact page.


 CASE STUDY - TEHRAN
 
Mechanical room has 4 hot water Bolier with capacity of 25,000,000 BTUH each. Boiler output temperature is 130ºC and return and supply collector size is 14”. Hot water is pumped to several mechanical around the site.
A 14” HydroFlow C type is installed on main return pipe from site before hot water boilers.
tehran1 tehran2

Azadi Sport Complex was used for the 7th
Asian Games in 1974. The 450 hectare site
is locatedwest of Tehran.
tehran4

 CASE STUDY - FRANCE

 

scale be

BEFORE: above shows the condition of the plates before the installation of the 2 units.
flat

SOPAREC performs the maintenance of the heating and domestic hot water installations of the buildings complex Le Gai Logis at Le Bourget. It is composed of more than one hundred and fifty apartments. The incoming water from the mains is heated by two Heat Exchangers of sufficient size for the hot water needs of the complex.
The heat exchangers, fed by the mains water from the city, are opened and cleaned every 4 months to re-establish the flow and efficiency.

b4

BEFORE: Scale is present on the plates of the first heat exchanger AFTER being cleaned and operating for two months(summer season) without the protection of the units.

INSTALLED: Two HydroFLOW ‘C’ units, one per heat exchanger, were installed two months after their periodical maintenance cycle.

  first-right

AFTER:
first heat exchanger was opened
for inspection one month later and no scale was present as shown by the picture above.



second-right

AFTER:
second was opened after 8 months of summer & winter operation.
Its plates were perfectly clean with
no trace of scale as shown above

 CASE STUDY - ISRAEL
 
Story of a Power Station

The pipe is 3-4 kilometres long, which goes from a small lake to the Jordan River.
There is a small drop of 60m. At the bottom is a power plant.
The pipe sizes span from 16” to 30”. The problem was the build-up of limescale. There was a ring of limescale 80mm thick all along the pipe.
In 1998 the power station installed a Custom Hydroflow. After one year they knew it worked as deposit of limescale stopped. Existing limescale has consistently reduced by a few millimetres each year.

In 2003 x2 26” Custom Hydroflow were installed. After two years another Custom Hydroflow was also installed. The plant is very happy with the success and with each new pipe installation, Hydroflow is also installed.
Prior to the Hydroflow, the costs for cleaning the pipe by mechanical and acid systems were 5 times that of the cost of the Hydroflow. The replacement of completely blocked pipes cost several million dollars.

The effect of limescale blocking the pipe sometimes caused flooding, as the pipe could not withstand the full water flow. With the installation Hydroflow this too is a problem of the past.

 

ff

 

cx
 
BEFORE & AFTER PHOTOGRAPHS

longshot BEFORE -
installing HydroFLOW
Commercial model.
AFTER -
Heat exchanger
opened after 5 months
and completely clear.
after
before after
 
Independent study, full report available.
 
bsale bfore hydro BEFORE scale free AFTER
                    Scale before Hydroflow            Scalefree after Hydroflow


 CASE STUDY - USA
   

The Montclair Y.M.C.A in New Jersey, America has two swimming pools and shower facilities that require constant hot water - presenting a big challenge to the management and maintenance teams.

With such a demand on the heat exchangers, limescale build-up has been a perennial problem; not only does it increase fuel usage, but if left unchecked could result in equipment failure. The centre therefore had to regularly take them off-line to descale the heat exchangers.

However, the problem has now largely been removed due to the installation of Hydropath’s ‘Hydroflow’ water treatment system.
Due to the large diameter pipes, a Hydroflow C unit was required;
the unit is designed to prevent limescale build up in large diameter pipes in commercial installations. Because it affects the property of the water flowing through the system, it can also help remove existing deposits. 

ymca-usa

 

"Heating the water caused a scale build up in the heat exchanger tubes, and there was a big loss of heat transfer due to this build up",
says Sal Maffettone the Vice President of Metric Plumbing & Heating, who has been responsible for all the centre’s major plumbing and maintenance for the past five years.

The site has previously attempted to increase the life of their appliances, and improve the efficiency of the heat exchangers and boilers using alternative methods.  They were only of marginal benefit and still required a large amount of maintenance – not to mention chemical treatments.  Management then decided to trial Hydropath’s patented water treatment technology;
"We installed the Hydroflow C60 three months ago. Before the installation, we opened the heat exchanger and saw that the tubes were scaled. We opened the heat exchanger after three months and we could not believe how clean it was inside".

The technology works by randomly inducing varying electric fields into the water, which propagate through the entire plumbing system. The result is the production of nuclei everywhere in the water system. When the water is heated, the hard water salts, which usually deposit as encrusting limescale on the surfaces, grow in suspension and are washed away in the flow. The electric field treats the water both up and down stream and is transmitted into the central heating system to
treat the primary water. The treated water is normally able to dissolve existing scale in just a few weeks.

The management now bypass the water softener and have stopped using chemical additives to let the Hydroflow unit take care of the heat exchanger.  They intend to use Hydropath technology for all the boilers and heat exchangers on this site and in other locations undertaking maintenance.


 2 CASE STUDIES - PORTUGAL
   
ESTREMOCENSE - PORTUGAL
 
TUDOR - PORTUGAL
1
2 3
The meat factory is located in the interior of Portugal, Estremoz, the water there is extremely hard and they usually have all sorts of problems in their process line.
The installation was made because they invested on a 72
5
panel solar system for hot water and in order to protect both the water deposits as well as the plate heat exchanger that connects to the solar system closed circuit one C45 unit was installed to protect that specific system. Never had any problems and the water is not treated.
 


The Tudor installation was for the locker room of the employees and kitchen used at the factory.

They have around 300 baths per day. Currently they have 3 gas boilers connected to a plate heat exchanger that goes to the water deposit that goes to the locker room and prior the plate heat exchanger there is a split to the kitchen.

The C60 units were placed, one before the plate heat exchanger and the second after the water deposit to the locker room.


Copyright: © Hydropath Holdings Ltd. 2008              home   |   technology   |   products  |   technology   |   FAQs   |   contact   |   download centre

c range

Designed and manufactured to treat the consequences of limescale in industry and commerce, in all areas of heating, ventilation and plumbing.



Prevents scale
  formation
Treats the system up
  & downstream
Removes limescale
Cuts heating costs,
  conserves energy
Extends equipment life
No plumbing required
Easy to install
Maintenance free
No chemicals
Economic to operate

effct
-  The green technology that saves YOU money
logl